Pre-tied adjustable guy line set
A set of guy lines with fixed loops at the tent end and friction hitches at the peg end, ready to clip on and tension in seconds.
- Difficulty
- Time
- 40 minutes for eight lines
- Knots
- 5
Why make it
Tying fresh guys in wind and rain is slow and the knots end up rushed. Pre-tied lines with a slide-and-grip hitch go on in a few seconds and can be retensioned without untying.
Steps
- Seal both ends of each cord with a flame.
- Tie a figure-eight loop about 50 mm long at one end. This loop larks onto the tent's guy point or passes through it.
- Lay the line out, pass the free end round a peg, and tie a midshipman's hitch on the standing part about 300 mm from the peg.
- If you prefer, use a taut-line hitch instead. On slippery cord the midshipman's grips better.
- Tie a figure-eight knot in the very end so the tail cannot slip out of the hitch.
- Slide the hitch up to test it. Then loosen it off the peg and chain sinnet the whole line from the tent end for storage. A pull on the tail undoes the chain in one go.
Tips
- Colour-code lines by length if your tent uses different ones.
- Thin, slick cord needs an extra wrap in the hitch.
In the Strekka system
The midshipman's hitch is Strekka's stand-in for an inline guy tensioner.