Broken line repair kit and bends
Rejoin a snapped guy, tow line or tie-down in the field with the right bend for the rope, and carry the cord to do it.
- Difficulty
- Time
- 20 minutes to practise
- Knots
- 5
Why make it
Lines break at the worst times: a guy in a storm, a tie-down on a corrugated road. Knowing which bend suits which rope means the repair holds and can be untied later.
Steps
- Cut out damaged rope on each side of the break. A bend tied in frayed rope will fail.
- For two lines of the same size that you will want to untie, tie a zeppelin bend. It holds well and releases even after heavy load.
- For thin, slippery cord that will not need untying, tie a double fisherman's bend. It is very secure but jams.
- To join a thin line to a thicker one or to a loop, tie a sheet bend with the thicker line forming the bight. Use a double sheet bend for big size differences or slippery line.
- For a familiar, easily checked join in equal ropes, tie a figure-eight bend.
- Leave tails of at least 10 rope diameters and pull each part hard before loading.
- Replace the joined line properly once you are home.
Tips
- Practise each bend with your eyes shut. You will tie them in the dark.
- Never join ropes with a reef knot. It can capsize and pull apart under uneven load.